Back-to-back housing
Back-to-back housing is a form of terraced housing in which two houses share a rear wall. With the rapid expansion of the population in Victorian Britain’s factory towns during the Industrial Revolution, many thousands of back-to-back houses were built.
They were typically occupied by working class people and were generally of low quality and high density. The houses were usually either ‘two-up-two-down’ (i.e. two rooms on both floors), or one room on each of three floors.
Because three of the four walls were shared with other buildings, this type of housing suffered from poor illumination and ventilation. However, they did have some benefits, such as being cheap to build and inexpensive to rent, as well as delivering high-density while giving people their own home as opposed to a flat.
Back-to-back housing was eventually judged to be unsatisfactory and the Housing Act of 1909 outlawed further construction. However, some local authorities continued to sanction their construction until the late-1930s.
Back-to-back housing was particularly common in the inner city areas of Birmingham, Bradford, Leeds, Liverpool, Salford and Nottingham. Only small areas of the housing still exists, most notably in Birmingham where they have been preserved as a museum by the National Trust.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.